New technical note AGE-PN-001: reproducible benchmark for WDM stability See evidence
Solutions

Measure. Validate. Integrate. In that order.

AGE reduces adoption risk: each phase delivers an evidence-based decision before the next commitment.

Adoption path

An offer built around decisions, not promises.

The free phase detects whether continuing makes sense. Later phases are agreed only when the data show a defensible improvement.

Phase 01free

Bounded evaluation

One log, one baseline and one metric. Offline result with explicit limits.

Phase 02Diagnostic

Platform identification

Common/local modes, effective dynamics, noise and uncertainty.

Phase 03Prototype

Compensation module

Implementation tailored to monitor cadence, data interface and available actuators.

Phase 04Validation

Platform test

Agreed comparison on hardware or a characterization bench with prior acceptance criteria.

Technical capabilities

One software layer for distinct temporal phenomena.

available

WDM thermal stability

Structured estimation for microring banks with a serial monitor or non-simultaneous multichannel observations.

  • Sample-and-hold benchmark
  • Common/local state
  • Between-probe prediction
  • Uncertainty intervals
to validate

Detuning compensation

Turning the estimator into correction commands within platform actuator and control constraints.

  • Actuator map
  • Limits and saturation
  • Latency and cadence
  • Staged closed-loop test
research

Itinerant temporal modes

Linear and regularised receiver design under temporal-template distortion.

  • Overlap matrix
  • Minimum-norm zero forcing
  • Selectivity–efficiency frontier
  • Realizability checks
Deliverables

What the technical team receives.

Every phase separates inputs, assumptions, results and limits so the analysis can be audited.

PhaseMain outputDecision
EvaluationOffline comparison + limitations noteIs there an opportunity?
DiagnosticIdentified model + uncertaintyIs it stable and generalisable?
PrototypeModule, interface and testsDoes it meet constraints?
ValidationReport against agreed criterionShould it be deployed?
Good fit

When it makes sense to speak with AGE.

Probably yes

  • A multichannel bank has observable drift or distortion.
  • Logs include timestamps and channel identity.
  • The team can define an operational baseline and metric.
  • Software control is being explored before hardware redesign.

Probably not yet

  • No characterization data exist and none can be generated.
  • The target variable is not observable.
  • No compatible actuator exists for a compensation phase.
  • A performance guarantee is required before measuring the platform.
Entry point

Start with the smallest problem that can decide something.

Describe the platform, available signal and current baseline. We will confirm data fit before requesting a file.